Architectural imaging:  bridge moving A45 / B54

 
Project:
Contact:
Object:
bridge moving A45 / B54
Type:
steel-concrete-bonded-bridge
Location:
Haiger-Kalteiche [satellite]
Country:
Germany
Architect:
Materials:
steel, concrete SPMT (transport)
Production:
Jul 20, 2019
Images:
30
Content:
[article]      [image gallery]      
 
A45-bridge, Haiger: video, distant camera
A45-bridge, Haiger: video, close camera
A45-bridge, Haiger: transport-preparation
A45-bridge, Haiger: bridge still placed on tremporary bearings
A45-bridge, Haiger: hydraulic jacking system under bridge
A45-bridge, Haiger: hydraulic jacking system with stack-box drawer
A45-bridge, Haiger: hydraulic jacking system, frontal view
A45-bridge, Haiger: hydraulic jacking system, stack-box depot
A45-bridge, Haiger: self-propelled transporter (SPMT), fig. 1
A45-bridge, Haiger: self-propelled transporter (SPMT), fig. 2
A45-bridge, Haiger: bridge beside final bearing
A45-bridge, Haiger: bridge-road short before transport
A45-bridge, Haiger: steel framework of support structure
A45-bridge, Haiger: boundary fixation are concreted after transport
A45-bridge, Haiger: open framework joint
A45-Brücke, Haiger: open framework joint, detail
A45-Brücke, Haiger: if sprayed or rolled - the finish is looking different
A45-bridge, Haiger: soffit-view of bridge-road showing exposed concrete
A45-bridge, Haiger: the lateral bridge slope enables one-sided drainage
A45-bridge, Haiger: within the crash barriers a steel cable is merged
A45-bridge, Haiger: preparing central reservation crossing
A45-bridge, Haiger: bridge to starts to move
A45-bridge, Haiger: helmsmen steering SPMT by remote control
A45-bridge, Haiger: a giant traverse spread the bridge's wight on 8 SPMT
A45-bridge, Haiger: there was a front and a back unit formed by 8 SPMT
A45-bridge, Haiger: front and back unit got own helmsman
A45-bridge, Haiger: lateral bridge-move within final bearings
A45-bridge, Haiger: northern bridge placed at their final distination (seen in video)
A45-bridge, Haiger: southern bridge placed at their final distination (moved on following day), fig. 1
A45-bridge, Haiger: southern bridge placed at their final distination (moved on following day), fig. 2